top of page

References

Industrial Halls, Warehouses and Production Facilities

Often while our clients continued their operations without interruption.

Our extensive portfolio of industrial projects across Hungary demonstrates our expertise and reliability.

loading lock construction

Loading station constuction
Complete construction of a loading dock of an existing industrial facility, with related structural, cladding and external infrastructure works. The investment was implemented as a general construction project, while maintaining continuous plant operations.
Budapest 10th district

Flat Roof Waterproofing

Flat roof waterproofing
Complete waterproofing renovation of the flat roof of an existing industrial building with a modern PVC insulation system. The investment was implemented as a general construction project, while the building was in continuous operation.
Budapest X. district Kőbánya

Flat Roof Waterproofing

Magyar Vagon Vasúti Kft. We carried out a complete inspection and repair of the flat roof insulation of a carriage repair workshop and social building on an industrial site — from replacing drainage elements to repairing junction defects, on an area of nearly 6,000 m², in an operating industrial environment.
Celldömölk, Vas County

family house general construction

General construction of a family house (in progress)
Complete general construction of a new family house. The project includes the full implementation of structural, technical, mechanical and finishing works, with turnkey delivery.
Berkenye, Nograd County

industrial hall general construction

Automated high-bay warehouse – Phase III
The general construction of an automated high-bay warehouse was carried out on behalf of Tracon Kft., which included structural construction and finishing works, as well as the development of the internal road network and parking lots.
Dunakeszi, Pest County

szolnok.jpg

Public building roof renovation and lightning protection conversion
Prosecutor General's Office, Directorate General of Economic Affairs
Renovation of low-pitched roofing, covering of valleys, superstructure and firewalls
Szolnok, Jász-Nagykun-Szolnok County

industrial hall general construction

General construction of an automated high-bay warehouse for Tracon Ltd. Phase II, our project includes the following:
Structural works and finishing works
Development of internal road network
Design of parking lots
Dunakeszi, Pest County

industrial hall general construction

General construction of a high-rise warehouse hall and office building for Zenit Kft., our project includes the following:

  • Structural works and finishing works

  • Development of internal road network

  • Design of parking lots

  • Dunakeszi, Pest County

family house general construction

Newly built family house –
Construction of a turnkey family house with premium technical content. As part of the project, a solar panel system, complete garden construction, built-in kitchen furniture and bathroom furniture were created, so the property was handed over in an immediately move-in condition.
Szodliget, Pest County

industrial hall general construction

Our hall and office building project located at 1-5 Fátyolka Street, Budapest includes the following:

  • Structural works and finishing works

  • Development of internal road network

  • Parking lot and park design

  • Budapest 10th district, Kőbánya

industrial hall general construction

The project included the construction of new warehouse and production units as general construction. As part of the construction, building maintenance tasks, as well as construction and utility conversion works related to technological transformations, were also completed.
Nograd County

family house general construction

Newly built family house – Construction of a turnkey family house with premium technical content. As part of the project, a solar panel system, complete garden construction, built-in kitchen furniture and bathroom furniture were created, so the property was handed over in an immediately move-in condition.
Dunakeszi, Pest County

industrial hall general construction

Our project for the production hall at Új Ecseri út 1, Vecsés, includes sandwich panel installation works, as well as related edging and ducting works. The works we perform ensure the high-quality construction and timely delivery of the hall. Vecsés, Pest County

industrial hall general construction

The investment included the general construction of new warehouse and production halls. The project included building maintenance work, as well as construction and utility construction tasks necessary for technological developments. Nagyoroszi, Nógrád county

industrial hall general construction

Construction of new warehouse and production units. (General construction). Building maintenance, construction and utility conversion works related to technology conversions. Nagyoroszi, Nógrád county

office fit out

Modern office fit out space design
Complete conversion of an existing small supermarket cornerbuilding into a modern office space. Complete interior renovation, new mechanical and electrical systems, new cladding, glass walls and lighting. The investment was implemented as a general construction, turnkey project.
Budapest X. District, Kőbánya

family house general construction

Complete reconstruction and expansion of a family house with attic installation Complete reconstruction and expansion of a family house from a Kádár-kocka building. Structural transformation, new roof, complete interior renovation, new mechanical and electrical systems, new facade design, as well as garden construction, fence construction and exterior paving works were also implemented. The investment was completed in general construction, turnkey condition
Szodliget, Pest County

Dunakeszi family house general construction

Complete reconstruction of a family house with an additional floor Complete reconstruction and expansion of a family house from a Kádár-kocka building. Structural transformation, complete interior renovation, new mechanical and electrical systems, new facade design, as well as garden construction, fence construction and exterior paving works were also implemented. The investment was completed in general construction, turnkey condition
Dunakeszi, Pest County

Hungarian Railway MAV Flat Roof Waterproofing

Industrial hall roof insulation and drainage renovation — design and construction MÁV-Start Zrt.
Flat roof insulation of a car repair shop and a social building, renovation of the drainage system
Celldömölk, Vas County

general construction of the porta building

KNAUS Tabbert Kft. Porta building construction Nagyoroszi, Nógrád County

office building general construction

KNAUS Tabbert Ltd Nagyoroszi Office building design and equipment

Nagyoroszi, Nógrád County

industrial hall general construction

Construction of an automated high-bay warehouse for Tracon Ltd. Phase I, our project includes the following:

Structural works and finishing works

Development of internal road network

Design of parking lots

Dunakeszi, Pest County

Kép4.jpg

Knaus Tabbert Kft. Development of the internal road network of Greater Russia

Nagyoroszi, Nógrád County

industrial hall general construction

Construction of a new warehouse. (General construction). Building maintenance, construction and utility conversion works related to technology conversions. Nagyoroszi, Nógrád County

parking lot general construction

Parking lot and internal road network development Budapest 10th district Kőbánya, Industrial area

email: info@lesildzsas.hu address: 2120 Dunakeszi, Fóti út 45. tel: 06-27-348-768

  • Instagram
  • Facebook
  • LinkedIn

©2026 by Les Ildzsas Zrt. 

bottom of page